BESS Installation

Note:

Installation should be conducted on a flat surface in an open space.

The BESS installation process is illustrated with ST050CF as an example.


  1. Install leveling adjusters to level the base. (If the equipment is installed against a wall, maintain a 25 mm to 30 mm clearance between the base and the wall.)

    Note:

    If the installation site floor already meets the levelness requirement and no adjustment via leveling adjusters is needed, the battery base can be directly placed on the floor and secured using the L anchor bracket sheet metal.

  2. Install the vertical lifting handles (two on each side) onto the Packs. Ensure they are fully screwed in. Two persons must work together to carry the Packs and place them onto the base from bottom to top. After installing the Packs, remove the vertical lifting handles and install the nylon protective caps in the handle mounting points.
    Notice:
    • Packs can be manually lifted using handles or hoisted using shackles (recommended: US-standard bow shackle, 0.75 tonnes) attached to the four lifting points on the Pack upper cover.

    • Lift and install Packs with care. Localized paint peeling on the enclosure may occur if the equipment is handled roughly.

    • Minor gaps between Packs may occur during random stacking, but this does not affect electrical performance. If a more seamless appearance is preferred, try reordering the Packs. If the issue persists, contact SUNGROW or the retailer.

    Note:
    • Do not tilt the Packs during installation.

    • Store the vertical lifting handles properly for future use.

  3. Install the Pack wall mount across the topmost Pack to prevent the system from tipping over. (If the equipment is not installed against a wall, skip this step.)
    Notice:

    When performing drilling operations, personnel must wear safety goggles and a dust mask to protect against dust exposure to the eyes and respiratory system. Upon completion of work, promptly clean up any residual dust generated by the operation.

    Note: If the battery stacks are arranged in a U-shaped layout, back-to-back mounting brackets for Packs must be installed on the topmost Pack.
  4. Install the decorative upper cover onto the S/G first, then fix the complete S/G assembly onto the Pack.
    Notice:

    The main battery stack is equipped with an S/G at the top, while the auxiliary battery stack features an upper cover. An upper cover is required for the auxiliary battery stack. The installation steps remain the same as above.

  5. Install the fixing bracket to prevent accidental displacement of the S/G, which could cause an arc fault. Insert the bracket into the gap between the S/G and the Pack and fix the bracket using screws.
    Note: For auxiliary battery stacks with a upper cover, install the fixing bracket following the same procedure.
  6. Install the cable duct and the side sealing plates of the base. (For a BESS configured with a single main battery stack, only the base side sealing plates are necessary.)
    Note:

    If the BESS includes both main and auxiliary battery stacks, the cable duct must be installed between such stacks to protect the cables.

    Figure1 Cable Duct Installation
    Figure2 One-Row Layout